Easiroll - FAQ
|
How many screws will I need ? Allow 6 screws per metre of purlin and go up to nearest the 50 (50 screws per bag) At what intervals should the screws be placed on the roof? Screws should be at every second corrugate on all purlins. What spacing should the purlins be at? Purlins should be at 900 mm on the roof and 1200 mm on the wall. Should I drill an over size hole for the screw? As Easiroll has very little movement, it is not necessary to oversize the hole. Easiroll screws will drill themselves. Polycarbonate sheets need oversize holes. Which side is up on Easiroll? Just roll out as it comes, do not turn over against the natural roll. How should I connect my roof onto the house to make it waterproof? Use Easiroll's EASIFLASH. see Accessories How will I finish the ends of my roof? A simple galvanized or coloursteel 90mm x 90mm will do the job, and can be obtained from Easiroll. From ordering, how long does it take to get my roof? For most destinations in the North Island it is overnight, and 2 to 3 days for the South Island. For any other enquiries please contact us. |